1. MOUNTING
1-10
1.2.7
How to install the stays (anti-vibration and anti-shock mea-
sures)
This measure must be done after installing the hull unit to prevent damage from vibra-
tion or impact shock to the transducer. Stays should be as sturdy as possible
(75
×
75
×
9 mm minimum recommended). Install a minimum of two stays, one in the aft
direction, one in the fore direction. Where possible install two more stays (one in the
port and one in the starboard direction), making a total of four stays. Where the hull
unit is installed off center from the bow-stern line, install the stays at right angles with
the bow mark on the hull unit.
Where horizontal installation of the stays is not possible, install the stays in a diagonal
manner to reduce vibration in the hull unit.
90°
Stay
Stays installed diagonally have
their effectiveness reduced.
Install stays as close to
horizontal as possible.
Ceiling beam
Eye bolt
Stay
Recommended stay installation
Bow mark
Bow mark
Stay
Non-horizontal stay installation
Secured to ship’s
hull frame work.
Stay
Summary of Contents for FSV-75
Page 50: ...1 MOUNTING 1 42 This page is intentionally left blank ...
Page 118: ...D 1 6 Mar 2019 H MAKI ...
Page 119: ...D 2 22 Aug 2018 H MAKI ...
Page 120: ...D 3 22 Aug 2018 H MAKI ...
Page 121: ...D 4 5 Dec 2018 H MAKI ...
Page 122: ...D 5 5 Dec 2018 H MAKI ...
Page 123: ...D 6 16 Apr 2019 H MAKi ...
Page 124: ...D 7 16 Apr 2019 H MAKI ...
Page 125: ...D 8 16 Apr 2019 H MAKI ...
Page 126: ...D 9 16 Apr 2019 H MAKI ...
Page 127: ...D 10 9 Oct 2018 H MAKI ...
Page 128: ...D 11 22 Apr 2019 H MAKI ...
Page 129: ...D 12 9 Oct 2018 H MAKI ...
Page 130: ...D 13 9 Oct 2018 H MAKI ...
Page 131: ...D 14 6 Mar 2019 H MAKI ...
Page 132: ...D 15 19 Nov 2018 H MAKI ...
Page 133: ...D 16 8 Jan 2019 H MAKI ...