1. MOUNTING
1-5
1.2.3
Preparation when a FRP retraction tank (inner diameter: 306
mm) is used
Note:
The following procedure is
required only when a FRP retraction tank (inner
diameter: 306 mm) is used
. If a steel retraction tank (inner diameter 316 mm) is
used, skip the following procedure.
1. Unfasten the six countersunk head screws (M5
×
10) to remove the contact plate
(four locations). Discard the removed contact plates and screws.
2. Remove the three hex socket bolts (M4
×
8) that secure the spring assembly (four
locations).
3. Rotate the four spring assemblies by 90° in the direction of the arrow on the bot-
tom of the spring assembly, then secure the spring assemblies using the hex
socket bolts that were removed at step 2.
If you cannot rotate the spring assembly by hand, use a tool such as a wrench
whose hex size is 19 mm.
4. Check that the four rollers on the side of the tank guide are pushed inwards ap-
prox. 5 mm.
150-200 mm
Reinforcement rib
added along keel line
Keel line
Doubling plate
Bow
Stern
Fit doubling plates where the retraction
tank meets the frame and keel.
Ship’s framework
Minimum 12 mm
Contact plate
Countersunk head
screw (M5×10)
Spring
assembly
Hex socket bolt
(M4×8)
Spring
assembly
Rotate the spring assembly in the direction of the arrow.
Roller
Summary of Contents for FSV-75
Page 50: ...1 MOUNTING 1 42 This page is intentionally left blank ...
Page 118: ...D 1 6 Mar 2019 H MAKI ...
Page 119: ...D 2 22 Aug 2018 H MAKI ...
Page 120: ...D 3 22 Aug 2018 H MAKI ...
Page 121: ...D 4 5 Dec 2018 H MAKI ...
Page 122: ...D 5 5 Dec 2018 H MAKI ...
Page 123: ...D 6 16 Apr 2019 H MAKi ...
Page 124: ...D 7 16 Apr 2019 H MAKI ...
Page 125: ...D 8 16 Apr 2019 H MAKI ...
Page 126: ...D 9 16 Apr 2019 H MAKI ...
Page 127: ...D 10 9 Oct 2018 H MAKI ...
Page 128: ...D 11 22 Apr 2019 H MAKI ...
Page 129: ...D 12 9 Oct 2018 H MAKI ...
Page 130: ...D 13 9 Oct 2018 H MAKI ...
Page 131: ...D 14 6 Mar 2019 H MAKI ...
Page 132: ...D 15 19 Nov 2018 H MAKI ...
Page 133: ...D 16 8 Jan 2019 H MAKI ...