Three cables are terminated at the radar processor unit: the antenna unit cable,
switching hub cable, and the power cable. Cables other than the power cable come
with a connector preattached to them for connection to the processor unit. Fabricate
the power cable as below. For the power cable, use DPYC-2.5 (Japan Industry Stan-
dard) Cable or the equivalent.
Note:
For AC: Pass the AC line through a double-contact breaker (shipyard supply)
Fabricating the power cable
1. Cut armor of the cable by 40 mm.
2. Cut vinyl sheath by 35 mm.
3. Remove insulation of wires by about 10 mm. Fix crimp-on lugs to the cores.
4. Peel paint of the armor by 40 mm.
5. Cover the end of armor with vinyl tape (20 mm).
40 mm: Scrape off paint.
Taping
(a)
(b)
(d)
Armor
35 mm
10 mm
(c)
Approx. 40 mm
DPYC-2.5
Vinyl sheath
Summary of Contents for FCR-2829W
Page 14: ...EQUIPMENT LISTS xii This page is intentionally left blank ...
Page 88: ...2 WIRING 2 54 This page is intentionally left blank ...
Page 154: ...D 1 Y Hatai ...
Page 155: ...D 2 14 Feb 2011 Y NISHIYAMA ...
Page 156: ...D 3 16 Jun 2011 Y NISHIYAMA ...
Page 157: ...D 4 Y Hatai ...
Page 158: ...May17 07 R Esumi D 5 ...
Page 159: ...13 Feb 2014 H MAKI D 6 ...
Page 160: ...D 7 24 May 2012 Y NISHIYAMA ...
Page 161: ...D 8 24 May 2012 Y NISHIYAMA ...
Page 162: ...D 9 24 May 2012 Y NISHIYAMA ...
Page 163: ...D 10 ...
Page 164: ...D 11 ...
Page 165: ...D 12 ...
Page 166: ...D 13 12 May 2015 H MAKI ...
Page 169: ...13 Jan 2012 Y NISHIYAMA 西山義浩 D 16 ...
Page 170: ...13 Jan 2012 Y NISHIYAMA D 17 ...
Page 171: ...D 18 ...