
10-2
Preparation before operation
HOW TO OPERATE CARRIER
WARNING
★
Heavy-duty operation of the crane during an initial period after the
start of operation may deteriorate its performance in a shorter time.
Take approximately 100 hours after the start of operation as a breaking-
in period during which abrupt start and acceleration, and continuous
operation under heavy load must be avoided.
CAUTION
★
Ventilate well when starting the engine in a small limited area or
indoors.
★
Do not start the engine from the outside of the operator’s seat.
★
Confirm the safety around the crane working site before starting the
engine.
2
Make sure that both crawling levers (left
and right) are at their neutral positions.
1
Press the pedal to release the interlock
for crane-crawl operation and hold it.
(When you take your foot off the pedal,
crawling levers are locked automatically.)
To “Crawl”
Summary of Contents for URW376C4U -T Series
Page 2: ......
Page 8: ...MEMO...
Page 30: ...MEMO...
Page 128: ...MEMO...
Page 146: ...MEMO...
Page 154: ......
Page 155: ......
Page 156: ...HEAD OFFICE Nihonbashi nishikawa Bldg 5 3 Nihonbashi 1 chome Chuo ku Tokyo 103 0027 Japan...