TX120 S3
Upgrade and Maintenance Manual
299
Front panel and LAN connector
13.1.5 Concluding steps
Perform the following procedures to complete the task:
Ê
Close the front cage as described in section
"Closing the front cage" on
page 68
.
Ê
Close the server cover as described in section
"Closing the server" on
page 70
.
Ê
Reconnect the AC power cord to the power supply unit.
Ê
Verify whether a backup copy of the system board settings has been
successfully transfered to the Chassis ID EPROM as described in section
"Verifying system information backup / restore" on page 90
.
Ê
Store your server’s system information on the Chassis ID EPROM
integrated into the front panel board. For further information on how to obtain
and use the
ChassisId_Prom
Tool, refer to section
"Using the Chassis ID
Prom Tool" on page 106
.
Ê
Enable boot watchdog functionality as described in section
"Enabling SVOM
boot watchdog functionality" on page 96
.
Ê
If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
"Enabling
BitLocker functionality" on page 103
.
Summary of Contents for PRIMERGY TX120 S3
Page 6: ...Upgrade and Maintenance Manual TX120 S3 ...
Page 8: ...Upgrade and Maintenance Manual TX120 S3 Version history ...
Page 22: ...Upgrade and Maintenance Manual TX120 S3 Contents ...
Page 26: ...26 Upgrade and Maintenance Manual TX120 S3 Introduction ...
Page 48: ...48 Upgrade and Maintenance Manual TX120 S3 Important information ...
Page 110: ...110 Upgrade and Maintenance Manual TX120 S3 Basic software procedures ...
Page 244: ...244 Upgrade and Maintenance Manual TX120 S3 Main memory ...
Page 362: ...362 Upgrade and Maintenance Manual TX120 S3 System board and components ...
Page 418: ...418 Upgrade and Maintenance Manual TX120 S3 Cables Figure 276 Installed BBU in BBU holder ...
Page 422: ...422 Upgrade and Maintenance Manual TX120 S3 Cables ...