Figure 15: Locking the cable clamp of a PSU
▶
Pull the cable clamp up (1).
▶
Thread the power cord through the cable clamp (2).
▶
Press the cable clamp down until it engages to secure the cable (3).
It will take about 60 seconds until the server can be powered on.
4.8
Switching on the server
CAUTION
▶
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
▶
"Important information" on page 29
.
▶
Press the On/Off button to start up the server.
▶
Ensure that the power-on indicator is lit green.
Basic hardware procedures
60
Upgrade and Maintenance Manual
RX4770 M6
Summary of Contents for PRIMERGY RX4770 M6
Page 80: ...Basic hardware procedures 80 Upgrade and Maintenance Manual RX4770 M6 ...
Page 166: ...Hard disk drive HDD solid state disk SSD 166 Upgrade and Maintenance Manual RX4770 M6 ...
Page 298: ...Liquid cooling LC 298 Upgrade and Maintenance Manual RX4770 M6 ...
Page 314: ...Accessible drives 314 Upgrade and Maintenance Manual RX4770 M6 ...