CAUTION
Maintenance procedures involving Field Replaceable Units must be
performed exclusively by Fujitsu service personnel or technicians
trained by Fujitsu. Please note that unauthorized interference with the
system will void the warranty and exempt the manufacturer from all
liability.
Components that are handled as Field Replaceable Units
–
CPU (replacement)
–
SAS/SATA HDD backplane
–
SAS expander / switch board
–
PCIe riser card
–
Common Operation Panel (COP)
–
System board
–
Trusted Platform Module (TPM)
–
Power distribution board (PDB)
–
Liquid cooling (LC) kit
–
Memory modules
Please ask your local Fujitsu service center for more information.
2.3
Average task duration
Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
Before you start
24
Upgrade and Maintenance Manual
RX4770 M6
Summary of Contents for PRIMERGY RX4770 M6
Page 80: ...Basic hardware procedures 80 Upgrade and Maintenance Manual RX4770 M6 ...
Page 166: ...Hard disk drive HDD solid state disk SSD 166 Upgrade and Maintenance Manual RX4770 M6 ...
Page 298: ...Liquid cooling LC 298 Upgrade and Maintenance Manual RX4770 M6 ...
Page 314: ...Accessible drives 314 Upgrade and Maintenance Manual RX4770 M6 ...