▶
"Resuming BitLocker functionality" on page 104
.
For CPU1 and CPU2 on the bottom system board:
▶
"Installing the air duct 2 (bottom system board)" on page 72
▶
"Installing the top system board carrier" on page 76
.
▶
"Installing the air duct 1 (top system board)" on page 71
▶
"Installing a riser module" on page 63
▶
▶
"Connecting the power cord" on page 59
▶
"Switching on the server" on page 60
When the system is powered on after a CPU has been replaced or
upgraded, the Global Error indicator will start flashing with the message
CPU has been changed
.
This only indicates that the CPU configuration has been altered. There
is no technical problem.
Proceed as follows:
●
Restart your server.
●
As soon as the startup screen appears, press the [F2] function key to
enter the BIOS.
●
If a password is assigned, enter the password and press [Enter].
●
Select the
Exit
menu.
●
Select
Commit settings and Exit
.
●
Verify that the Global Error indicator stops flashing.
▶
"Installing the front cover with lock" on page 61
.
▶
"Resuming BitLocker functionality" on page 104
.
Liquid cooling (LC)
RX4770 M6
Upgrade and Maintenance Manual
297
Summary of Contents for PRIMERGY RX4770 M6
Page 80: ...Basic hardware procedures 80 Upgrade and Maintenance Manual RX4770 M6 ...
Page 166: ...Hard disk drive HDD solid state disk SSD 166 Upgrade and Maintenance Manual RX4770 M6 ...
Page 298: ...Liquid cooling LC 298 Upgrade and Maintenance Manual RX4770 M6 ...
Page 314: ...Accessible drives 314 Upgrade and Maintenance Manual RX4770 M6 ...