RX200 S6
Operating Manual
55
Hardware installation
Racks with installation depth smaller/greater than 735 mm
The support systems can be used for installation depths of 714 - 785 mm. The
spring element of the support system is used to adjust the length as required.
Ê
Secure the support systems as described in section
"Installing the support
systems" on page 51
.
Ê
Mount the server (see
"Preparing the server" on page 52
) and route the
cables as described in the original manual of the rack.
V
CAUTION!
Ensure that the safety lock has been inserted before the server is
inserted (see
figure 5 on page 51
).
Summary of Contents for PRIMERGY RX200 S6
Page 1: ...Operating Manual English PRIMERGY RX200 S6 Operating Manual April 2010 ...
Page 6: ...Operating Manual RX200 S6 ...
Page 10: ...Operating Manual RX200 S6 Contents ...
Page 42: ...42 Operating Manual RX200 S6 Important information ...
Page 78: ...78 Operating Manual RX200 S6 Starting up and operation ...
Page 80: ...80 Operating Manual RX200 S6 Property and data protection ...
Page 86: ...86 Operating Manual RX200 S6 Troubleshooting and tips ...
Page 120: ...120 Operating Manual RX200 S6 Appendix server specification ...