52
Operating Manual
RX200
S6
Hardware installation
Ê
Insert (3) the safety lock into the easy lock (snap fit).
V
CAUTION!
Ensure that the safety lock has been inserted before the server is
inserted!
Ê
Repeat the above steps for the right-hand support system (with the front and
rear right support uprights).
Ê
Fit the PRIMECENTER/DataCenter rack cable management as described in
the technical manual for the corresponding rack.
Preparing the server
Figure 6: Preparing the server
Ê
Place the outer telescopic rails on the sides of the server (see arrow 1 in
figure 6
).
Ê
Slide the outer telescopic rails forwards to secure them (see arrow 2 in
figure 6
).
1
2
Summary of Contents for PRIMERGY RX200 S6
Page 1: ...Operating Manual English PRIMERGY RX200 S6 Operating Manual April 2010 ...
Page 6: ...Operating Manual RX200 S6 ...
Page 10: ...Operating Manual RX200 S6 Contents ...
Page 42: ...42 Operating Manual RX200 S6 Important information ...
Page 78: ...78 Operating Manual RX200 S6 Starting up and operation ...
Page 80: ...80 Operating Manual RX200 S6 Property and data protection ...
Page 86: ...86 Operating Manual RX200 S6 Troubleshooting and tips ...
Page 120: ...120 Operating Manual RX200 S6 Appendix server specification ...