38
Operating Manual
BX600
S3
Installing the System in the Rack
Installing the Hardware
©
c
ogn
it
a
s
.
G
e
s
e
lls
c
h
ft
f
ü
r T
e
c
h
ni
k
-D
o
k
u
m
e
n
ta
ti
on m
b
H
20
09
P
fad
:
H
:\
A
p
ri
l\
P
R
IM
E
R
GY
_R
eb
rand
in
g
\v
o
n W
a
lt
er
\b
x
600
_s
3_
ba\
B
X
6
0
0
S
3
_
e
n
\b
la
d
e
-u
s.
k0
4
4.3.1
Mounting the Assembly Kit
Mounting the server in the PRIMECENTER/DataCenter Rack requires the
following parts:
–
two support brackets
–
two carrier rails (assembled)
–
12 plug washers (
figure 7 on page 39
) and screws
I
For general information see the technical manual for the relevant rack
(see also
“Related Publications” on page 157
).
To mount the PRIMERGY BX600 S3 basic unit in the rack, you must first mount
two support brackets on the rear left support upright of the rack. The first one
must be mounted level with the lower edge of the device, while the second must
be mounted level with the upper edge of the first. The brackets are used for the
rear fixing of the left carrier rail.
Ê
See the installation instructions in the technical manual for the relevant rack
model.
Ê
Mark the position of the lower edge of the basic unit on the support uprights.
Figure 6: Mounting the support brackets
Ê
Place the first support bracket at the appropriate height (level with the lower
edge of the device) on the left rear support upright by inserting the posi-
tioning nubs (1 in
figure 6
) in the corresponding holes of the support upright.
Ê
Place the plug washers in the holes of the support uprights and secure the
bracket with two screws.
Ê
Repeat the procedure with the second support bracket.