BX600 S3
Operating Manual
35
Installing the Hardware
Installing the System in the Rack
4.3
Installing the System in the Rack
V
CAUTION!
●
For safety reasons, at least two people are required to install the
PRIMERGY BX600 S3 basic unit because of its weight and size.
●
Please observe the safety precautions and references to rack instal-
lation in the
chapter “Important Notes” on page 21
.
●
The rack may tip over if more than one unit is removed at the same
time.
Requirements of the Rack
The rack systems from Fujitsu Technology Solutions GmbH (PRIMECENTER
rack; DataCenter rack) fully support the installation of the PRIMERGY server
systems. Installation in the common rack systems of other manufacturers (3rd-
party rack) is supported to a large degree.
To accommodate the ventilation concept and ensure proper ventilation of the
components in the rack, any unused areas must be closed using dummy covers.
The unit is connected to the power supply via an external distribution board, a
32 A power distribution unit (PDU) or a UPS device.
The main features of the rack systems from Fujitsu Technology Solutions GmbH
are:
PRIMECENTER/DataCenter Rack
–
Frontally bolted rails.
The rails have a linear alignment option to also allow adjustment to different
rack depths.
–
Extended cable management within the lateral rack area.
The following applies to rack systems from third-party manufacturers: