Preparation for use and operation
A26361-K423-Z202-3-7619
17
Connecting the server to the power voltage
230
115
1
Ê
Check the rated voltage.
!
The rated voltage must agree with the local line voltage:
115 = 100 V to 125 V
230 = 200V to 240V
Ê
If the rated voltage does not agree with the local line voltage, lift out
the plug-in unit with a screwdriver (1), turn it and replace it.
1
2
Ê
Plug the server's power cable into the server (1).
Ê
Plug the server's power cable into the grounded power outlet (2).
Summary of Contents for PRIMERGY 300
Page 1: ...PRIMERGY 300 Server systems Operating Manual ...
Page 3: ......
Page 36: ......
Page 54: ......
Page 82: ......