Getting started
Getting started
Gettingstarted
Please observe the safety information in the
"Important notes", Page 9
chapter.
Unpacking and checking the delivery
It is recommended not to throw away the original packaging material! It may be
required for reshipment at some later date.
Packaging
Contentsofdelivery
Packaging,
►
Unpack all the individual parts.
►
Check the contents of the package for any visible damage caused during transport.
►
Check whether the delivery conforms to the details in the delivery note.
►
Should you discover that the delivery does not correspond to the delivery
note, notify your local sales outlet immediately.
Steps for initial setup
Preparingfor
fi
rstuse,overview
Preparingforuse,
Only a few steps are necessary to put your new device into operation for the
fi
rst time:
•
Select a location for device and set up device
•
Connecting external devices
•
Check the voltage at the mains outlet and connect the device to an electrical outlet
•
Switch the device on
You will learn more about the individual steps in the following sections.
External devices
If you have received other external devices in addition to your own device (e.g.
a printer), do not connect these until after the initial installation. The following
sections describe how to connect these external devices.
Drives and boards
If you have received drives or boards with your device, please do not install
them until after
fi
rst-time setup. How to install drives and boards is described
in the
"System expansions", Page 33
chapter.
12
Fujitsu Technology Solutions
Summary of Contents for CELSIUS W410
Page 1: ...System Operating Manual CELSIUS W410 ...
Page 3: ......