Brocade 6545 Gen5 16-Gbps FC Switch Module Hardware Reference Guide
11
53-1003184-01
Chapter
2
Installing the Brocade 6545 16 Gbps FC Switch Module
In this chapter
•
Shipping carton contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
•
Installation and safety considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
•
Unpacking the Switch Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
•
Installation and safety considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
•
Preparing the Blade Server for the Switch Module . . . . . . . . . . . . . . . . . . . . . . . . . 13
•
Inserting the Switch Module in the blade server. . . . . . . . . . . . . . . . . . . . . . . . . . . 14
•
Installation and safety considerations when handling transceivers and cables . 17
•
Inserting SFP+ optical transceivers and cables . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Shipping carton contents
The following items are included in the shipping carton:
•
One Brocade 6545 16 Gbps FC Switch Module (with 4 SWL 16-Gbps SFP+ pre-installed)
•
Brocade 6545 16 Gbps FC Switch Module QuickStart Guide
Unpacking the Switch Module
Perform the following steps to remove the
Brocade 6545 16 Gbps FC Switch Module
from its
shipping package.
1. Open the shipping box and inspect the contents for damage.
Do not insert a damaged Switch Module in the Blade Server chassis. If the Switch Module
appears to be damaged, contact your sales representative before proceeding.
2. Remove the foam layer that sits on top of the switch.
3. Remove the Switch Module from the protective foam surround.
4. Remove the foam ends from the Switch Module.
5. After ensuring that standard electrostatic device (ESD) precautions are made, slide the switch
out of the antistatic sleeve.
Refer to the Operating Manual that comes with your Fujitsu PRIMERGY BX900 S2 or PRIMERGY
BX400 Blade Server for additional instructions.