Chapter 2
What You Must Know Before Using DR
2-23
2.4.3.3
Flowchart: Moving a System Board
The flow of DR operations and the transition of system board status when a system
board has been moved or reserved for a move are described in the schematic
flowchart, below.
Each system board status indicated in
is the main status that is changed.
For the flow of system board addition processing or deletion processing and the
related system board status, see
Section 2.4.3.1, “Flowchart: Adding a System Board”
or
Section 2.4.3.2, “Flowchart: Deleting a System Board” on page 2-21
respectively.
Summary of Contents for SPARC Enterprise M4000
Page 2: ......
Page 6: ......
Page 23: ...Preface xxi Reader s Comment Form ...
Page 90: ...3 28 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 116: ...4 26 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 152: ...A 36 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 158: ...Glossary 4 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 161: ......