Chapter 4
Practical Examples of DR
4-15
8. Check the status of the domain.
Execute the
showdcl
(8) command to display domain information, and then
check the operation status of the domain. Based on the operation status of the
domain, determine whether to perform the DR operation or reboot the domains.
9. Add the new system board to the domain.
Execute the
addboard
(8) command to add the system board to the move-
destination domain.
10. Check the status of the domain and added system board.
When the
addboard
(8) command ends normally, execute the
showdcl
(8)
command to check the operation status of the domain, and then execute the
showboards
(8) command to check the status of the added system board.
If the
addboard
(8) command completes abnormally or leaves the board in an
unwanted status, refer to output messages to identify the problem, then correct
it.
XSCF>
showdcl -d 0
DID
LSB
XSB
Status
00
Running
00
00-0
01
01-0
XSCF>
addboard -c configure -d 0 01-0
XSCF>
showdcl -d 0
DID
LSB
XSB
Status
00
Running
00
00-0
01
01-0
XSCF>
showboards 01-0
XSB
DID(LSB)
Assignment
Pwr
Conn
Conf
Test
Fault
-----------------------------------------------------------------
01-0
00(01)
Assigned
y
y
y
Passed
Normal
Summary of Contents for SPARC Enterprise M4000
Page 2: ......
Page 6: ......
Page 23: ...Preface xxi Reader s Comment Form ...
Page 90: ...3 28 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 116: ...4 26 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 152: ...A 36 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 158: ...Glossary 4 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Page 161: ......