41S_Rev00
31
Basic Operation
Using Fiber Holder
1.
Loosen the 3 screws and take the sheath clamps off the splicer.
2.
Place the Set Plate “SP-31” to the base and tighten it by the 3 screws.
3.
Place fiber holders so that the guide pins on the stage go to guide-holes in the
fiber.
4.
Close the wind-protector.
The prolonged storage back and when splicing for the first time, we recommend you
execute for an Arc Calibration. Refer to [Arc Calibration].
Be careful not to contact the prepared fiber tips into anything to maintain fiber
end-face quality.
Loosen 3 screws.
Sheath clamp