1
1. Before Operation
1-1
MONITOUCH Operations
1.
Before Operation
Procedure before Operation
1. Mount and install the V9 series unit on the mounting panel, and carry out wiring.
For details, refer to the V9 Series Hardware Specifications manual.
2. Install peripheral equipment, such as PLCs and temperature controllers, and carry out wiring.
For details on wiring and setting procedures, refer to the V9 Series Connection Manual.
3. Turn on the power to the V9 series unit.
4. If turning on the power to the V9 series unit for the first time, select an interface language for the
unit.
5. Transfer the screen program created using the V-SFT editor.
For details on screen program transfer, refer to page 1-2.
6. Start operation.
When the connection with controllers has been established, MONITOUCH enters RUN mode.
* If MONITOUCH does not operate normally and shows an error message, refer to Chapter 3
and eliminate the cause of the error.