v
5.4 (17)
Selection of language (English/Japanese) ................................................................... 30
5.4 (18)
Analog output check .................................................................................................... 31
5.4 (19)
Analog output calibration ............................................................................................ 32
5.4 (20)
Status output check ...................................................................................................... 33
5.4 (21)
Test mode ..................................................................................................................... 34
6.
MAINTENANCE AND INSPECTION ............................................................................... 35
6.1
Maintenance ............................................................................................................................. 35
6.2
Inspection ................................................................................................................................. 35
7.
TROUBLESHOOTING ........................................................................................................ 36
7.1
How to confirm normal operation ............................................................................................ 36
7.1 (1)
When checking by LCD indicator ............................................................................... 36
7.1 (2)
LCD indication when power turned ON ...................................................................... 36
7.1 (3)
Detail check for abnormal status ................................................................................. 37
7.2
Faults and remedies .................................................................................................................. 38
7.2 (1)
LCD display abnormal ................................................................................................. 38
7.2 (2)
Key abnormal .............................................................................................................. 38
7.2 (3)
Measured value abnormal ............................................................................................ 39
7.2 (4)
Analog output abnormal .............................................................................................. 42
7.2 (5)
Remedy for hardware fault .......................................................................................... 42
8.
MOUNTING METHOD ....................................................................................................... 43
8.1
Mounting of sensor .................................................................................................................. 43
8.1 (1)
Mounting procedure of sensor ..................................................................................... 43
8.1 (2)
Selection of mounting place ........................................................................................ 44
8.1 (3)
Selection of mounting method ..................................................................................... 45
8.1 (4)
Processing of sensor mounting surface ....................................................................... 45
8.1 (5)
Determination of mounting position (with Z method for large and small types) ........ 46
8.1 (6)
Cable end treatment ..................................................................................................... 47
8.1 (7)
Connection of cable to small type sensor .................................................................... 48
8.1 (8)
Mounting of small type sensor on pipe ....................................................................... 49
8.1 (9)
Assembling procedure of the sensor ............................................................................ 51
8.1 (10)
Connection of cable to large type sensor ..................................................................... 52
8.1 (11)
Mounting of large type sensor on pipe ........................................................................ 53
8.1 (12)
Mounting of high temperature sensor on pipe ............................................................. 54
APPENDIX 1. SPECIFICATIONS .......................................................................................... A-1
APPENDIX 2. HOW TO MAKE GAUGE PAPER ................................................................ B-1
APPENDIX 3. COMPOSITION OF KEY OPERATION ....................................................... C-1
APPENDIX 4. PIPING DATA ................................................................................................ D-1