26
2-POSITION HEIGHT ADJUSTABLE BODYWORK DURING
LOADING (LIFTOP 2)
The Liftop 2P bodywork is bodywork that can be lifted for loading, fitted
with removable stops that make it possible to gain 50mm on the loading
rolling height.
• Raising:
⇒
release the side uprights if they remain in position or move
the stakes to the front or back of the vehicle making sure they
are locked,
⇒
raise the front and rear parts by releasing the handles and
pumping using the mechanism lever,
⇒
release the mechanism handle, making sure not to relock
it on its support.
• Lowering:
⇒
validate the side upright locking position depending on the
required rolling position (0 or +50mm),
⇒
validate the stop positions on the front and rear raising
mechanisms depending on the required rolling position,
⇒
lower each end of the vehicle while locking the mechanism
handle on its support,
⇒
reposition the side uprights if they were moved.
0
+50
Position 0
Po50
LIFTING BODYWORK DURING LOADING (LIFTOP)
To make loading/unloading operations easier, the front and rear uprights are fitted with
cylinders used to raise the roof.
• Raising:
⇒
open the rear doors and use the handles to keep them partially open,
⇒
raise the front and rear parts by releasing the handles and pumping using the
mechanism lever,
⇒
release the mechanism handle, making sure not to relock it on its support
⇒
the side uprights can remain in position during the loading/unloading
operations. If necessary, they can be slid to one end of the trailer.
• Lowering:
⇒
lower each end of the vehicle while locking the mechanism handle on its
support,
⇒
reposition the side uprights if they were moved.
CURTAINS >
EQUIPMENT AND OPTIONS
Lifting the front and rear parts on both sides of the bodywork at
the same time is not recommended.
Lifting the roof when open, opening the roof when the bodywork has
been raised on one side and driving with the roof raised are prohibited.
Summary of Contents for ArgoMax
Page 1: ...1 USER MANUAL MAINTENANCE LOGBOOK Designed to last ...
Page 6: ...GENERAL Safety instructions 7 Loading 7 Hitching 9 Before each trip 11 Unhitching 11 ...
Page 20: ...SLIDING CURTAIN SEMI TRAILER Use 21 Loading 24 Equipment and options 25 ...
Page 30: ...BOX TRUCKS Loading 31 Equipment and options 31 ...
Page 40: ...CONTAINER BED Subframe sliding 41 Loading unloading 41 Twin axle system 42 Twin trailer 43 ...
Page 44: ...CITY URBAN Loading unloading 45 Load distribution 46 Equipment and options 47 ...
Page 59: ...59 Inspection dates Mileage Service centre Work details Operation Comments A B C other ...
Page 60: ...60 Inspection dates Mileage Service centre Work details Operation Comments A B C other ...
Page 61: ...61 Inspection dates Mileage Service centre Work details Operation Comments A B C other ...
Page 62: ...62 NOTES ...
Page 63: ...63 NOTES ...