
Pin
Signal
I 1
+ 24 V DC
I 2
GND
I 3
High-end gas purging (from the front)
I 4
High-end gas purging (through the hosepack)
I 5
External valve brush cleaning
I 6
Internal valve brush cleaning
I 7
Pump for parting agent
8
NC
O 9
Pressure switch
O10
Parting agent fill level (optional)
11
Reserved
12
Reserved
O13
RR Single gas nozzle free
14
Reserved
I 15
RR Single start cleaning
16
Reserved
I 17
Reserved
I 18
Reserved
O19
Reserved
O20
Reserved
O21
TC cleaning error
I 22
TC spraying
O23
TC ready
I 24
TC start cleaning
O25
TC parting agent low level OK
I 26
TC quick stop
27
NC
O28
RR Twin gas nozzle free
29
Reserved
30
Reserved
I 31
RR Twin start cleaning
32
Reserved
33
Reserved
I 34
WC cut wire electrode
25
EN-US
Summary of Contents for Robacta TSS /i
Page 2: ......
Page 11: ...General 11 ...
Page 12: ...12 ...
Page 18: ...18 ...
Page 19: ...Operating controls connections and mechanical components 19 ...
Page 20: ...20 ...
Page 32: ...32 ...
Page 33: ...Installation and Startup 33 ...
Page 34: ...34 ...
Page 61: ...12 12 12 Connect the compressed air supply 61 EN US ...
Page 64: ...64 ...
Page 65: ...Cleaning Program Sequence 65 ...
Page 66: ...66 ...
Page 68: ...A B C D E F G 68 ...
Page 79: ...Reset external signal Internal valve brush cleaning 79 EN US ...
Page 84: ...Reset external signal Cut wire electrode End of the cleaning process Welding 84 ...
Page 85: ...Troubleshooting Maintenance and Disposal 85 ...
Page 86: ...86 ...
Page 97: ...Appendix 97 ...
Page 98: ...98 ...