Operating the system
Assembly and initial startup
Fröling Heizkessel- und Behälterbau Ges.m.b.H Industriestraße 12 A-4710 Grieskirchen
Page 17
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected] www.froeling.com
B 067 00 09
3
3
Operating the system
3.1
Assembly and initial startup
Assembly, installation and initial startup of the boiler must only be
carried out by qualified staff, and these procedures are described in the
accompanying assembly instructions.
See TX assembly instructions
NOTICE
Optimum efficiency and efficient, low-emission operation can
only be guaranteed if the system is set up by trained
professionals and observing the standard factory settings.
Take the following precautions:
Initial start-up should be carried out with an authorised installer or with
Fröling customer services.
3.2
Filling/ refilling the store with fuel
When you fill the store you should always ensure that you are using the
right fuel:
Page 9, 2.2.1 Permitted fuels
Caution:
Depending on the fuel and the fill level, different procedures must be
followed for filling the fuel store.
3.2.1
Loading wood chips in a partially emptied store
If there is still sufficient fuel in the store (the head of the stirrer is
completely covered with fuel), the store can be filled:
Load the fuel at the filling opening