
n
Check the device voltage with the values of the mains grid before
connecting the PULVERISETTE 14 premium line.
n
Plug the supplied power cable into the socket (Mains) on the back
side of the device.
n
Afterwards, connect the power cable of the PULVERISETTE 14 pre-
mium line to the electrical outlet.
n
200 - 240 V single phase alternating current and 200 - 230 V three-
phase alternating current with protective conductor, fuse max. 15 A
NOTICE!
Fritsch mills are speed controlled. The devices are equipped
for this with frequency converters. In order to comply with
the EMC directive, many measures must be taken to pre-
vent operational transient emissions.
The possible leakage currents resulting from filtering meas-
ures can trigger a conventional residual current circuit
breaker in the mains line. This is no defect!
To prevent this, special residual current circuit breakers,
which are adapted for operation with frequency converters,
are commercially available.
Operation without a residual current switch is possible, but
must be done in accordance with the relevant regulations.
Installation
- 22 -