5.
Switch on the transmitter with the On/Off button (A) and insert
the bowl as described in the operating manual of the mill in
chapter "Inserting the grinding bowl in the grinding bowl holder"!
NOTICE!
Check the fitting of the transmission unit again after
inserting the bowl!
NOTICE!
During a grinding, during the pauses, the correct
position of the Allen screws of the transmission unit
must to be checked. If screws became loose, re-
tighten them.
2.5 Installation of the receiver board in the P-7 premium line
DANGER!
Before starting the installation, disconnect the mains plug
and protect the device against being unintentionally
switched back on.
Secure installation work with a warning sign.
1.
The 6 screws (e) used to attach the rear panel to the housing are
undone and the rear panel is opened carefully.
EASY GTM Gas Pressure and Temperature Measuring System
- 45 -