RWB II ROTARY SCREW COMPRESSOR UNITS
INSTALLATION - OPERATION - MAINTENANCE
S70-200 IOM
Page 2
Contents
Maintenance
GENERAL INFORMATION ............................................. 22
NORMAL MAINTENANCE OPERATIONS ...................... 22
GENERAL MAINTENANCE ............................................ 22
COMPRESSOR SHUTDOWN and START-UP ............... 22
GENERAL INSTRUCTIONS FOR REPLACING
COMPRESSOR UNIT COMPONENTS. .................. 23
OIL FILTER (OF-1) MAIN SINGLE/DUAL ....................... 23
STRAINER - DEMAND OIL PUMP ................................. 23
STRAINER - LIQUID INJECTION ................................... 24
COALESCER FILTER ELEMENT(S) .............................. 24
CHANGING OIL .............................................................. 24
DEMAND PUMP DISASSEMBLY ................................... 25
RECOMMENDED MAINTENANCE PROGRAM ............. 29
VIBRATION ANALYSIS ................................................... 29
MOTOR BEARINGS ........................................................ 29
OIL QUALITY and ANALYSIS ......................................... 29
OPERATING LOG ........................................................... 30
MAINTENANCE SCHEDULE ......................................... 30
TROUBLESHOOTING GUIDE ........................................ 31
ABNORMAL OPERATION .............................................. 31
ANALYSIS and CORRECTION ................................ 31
SERVICING THE COLD-START VALVE ......................... 31
PRESSURE TRANSDUCERS - TESTING ...................... 31
PRESSURE TRANSDUCERS - REPLACEMENT .......... 32
SV POSITION POTENTIOMETER
REPLACEMENT AND ADJUSTMENT .................... 33
REPLACEMENT AND ADJUSTMENT .................... 33
RWB II COMPRESSOR ........................................... 35
OIL SEPARATION SYSTEM .................................... 35
HYDRAULIC SYSTEM ............................................. 36
LIQUID INJECTION OIL COOLING SYSTEM ......... 37
DEMAND PUMP SYSTEM ...................................... 38
THERMAL EXPANSION VALVES ................................... 39
JORDAN TEMPERATURE REGULATOR VALVE ........... 40
BARE COMPRESSOR MOUNTING ............................... 41
GREASE COMPATIBILITY .............................................. 41
NLGI Grease Compatibility Chart .................................... 41
P & I DIAGRAM .............................................................. 42
PROPER INSTALLATION OF ELECTRONIC EQUIPMENT
IN AN INDUSTRIAL ENVIRONMENT ...................... 46
FORMS
OPERATING LOG SHEET ....................................... 49
COMPRESSOR PRESTART CHECKLIST .............. 50
START-UP REPORT ................................................ 51
VIBRATION DATA SHEET ........................................ 53
RECOMMENDED SPARE PARTS ................................. 54
Indicates an imminently hazardous situation which, if not avoided, will result in death or serious
injury.
Indicates a potentially hazardous situation or practice which, if not avoided, will result in death
or serious injury.
SAFETY PRECAUTION DEFINITIONS
Indicates a potentially hazardous situation or practice which, if not avoided, will result in damage
to equipment and/or minor injury.
NOTE:
Indicates an operating procedure, practice, etc., or portion thereof which is essential to highlight.
Installation
FOUNDATION ................................................................... 4
RIGGING and HANDLING ................................................ 4
SKID REMOVAL ................................................................ 4
MOTOR MOUNTING ......................................................... 5
CHECKING MOTOR/COMPRESSOR ROTATION ............ 5
COMPRESSOR/MOTOR COUPLINGS
INSTALLATION .......................................................... 5
COUPLING ALIGNMENT PROCEDURE .......................... 7
HOT ALIGNMENT OF COMPRESSOR/MOTOR .............. 9
OIL PUMP COUPLING ..................................................... 9
HOLDING CHARGE AND STORAGE ............................... 9
COMPRESSOR UNIT OIL ................................................ 9
OIL CHARGE .................................................................... 9
OIL HEATER(S) ................................................................ 9
THERMOSYPHON OIL COOLING ................................. 10
LIQUID INJECTION OIL COOLING (Optional) ................ 11
WATER-COOLED OIL COOLING (Optional) ................... 12
LIQUID LINE SIZES/RECEIVER VOLUME ..................... 12
ECONOMIZER - HIGH STAGE (OPTIONAL) .................. 12
ELECTRICAL .................................................................. 14
MOTOR STARTER PACKAGE ........................................ 14
CURRENT TRANSFORMER (CT) RATIOS .................... 15
MINIMUM BURDEN RATINGS ....................................... 15
BATTERY BACKUP ........................................................ 15
Operation
OPERATION and START-UP INSTRUCTIONS .............. 16
TDSH COMPRESSOR ................................................... 16
COMPRESSOR LUBRICATION SYSTEM ...................... 16
NO PUMP OIL SYSTEM ................................................. 16
COLD-START SYSTEM .................................................. 16
DEMAND PUMP OIL SYSTEM ....................................... 17
COMPRESSOR OIL SEPARATION SYSTEM ................ 17
COMPRESSOR HYDRAULIC SYSTEM ......................... 18
VOLUMIZER® VOLUME RATIO CONTROL ................... 18
COMPRESSOR OIL COOLING SYSTEMS .................... 19
SINGLE-PORT LIQUID INJECTION ............................... 19
RWB II BOOSTER OR SWING DUTY APPLICATION .... 19
DUAL-PORT LIQUID INJECTION ................................... 19
LIQUID INJECTION ADJUSTMENT PROCEDURE ....... 19
SUCTION CHECK VALVE ............................................... 20
SUCTION CHECK VALVE BYPASS ................................ 20
LOW AMBIENT OPERATION ......................................... 20
POWER ASSIST KIT ...................................................... 20
INITIAL START-UP .......................................................... 21
INITIAL START-UP PROCEDURE .................................. 21
NORMAL START-UP PROCEDURE .............................. 21