![FRENCH FITNESS MSC10 Owner'S Manual Download Page 28](http://html1.mh-extra.com/html/french-fitness/msc10/msc10_owners-manual_2331444028.webp)
STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with
an Axle (#17), two M10 x 20 Allen Bolts (#36), and two
∅
10 Washers (#42).
Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two Foam
Tubes halfway through the holes on the Leg Developer (#5). Push six Foam Rolls (#24)
onto the Tubes from both ends. Plug six Foam Roll End Caps (#25) into the Tubes.
Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a Spring
Clip (#22) to the Sleeve.
B.)
C.)
DIAGRAM 4
27
Summary of Contents for MSC10
Page 4: ...WARNING LABEL PLACEMENT 3 ...
Page 14: ...CABLE LOOP DIAGRAM 47 46 49 48 13 ...
Page 21: ...SMITH CAGE EXPLODED DIAGRAM 20 ...
Page 30: ...SMITH CAGE EXPLODED DIAGRAM 29 ...
Page 40: ... Optional Attachment on the FF MSC10 EXPLODED DIAGRAM 9 ...
Page 41: ... Optional Attachment on the FF MSC10 HARDWARE FF MSC10 AB 10 ...
Page 54: ... Optional Attachment on the FF MSC10 EXPLODED DIAGRAM 7 ...