
WLA200 Rev140407
8
INSTALLATION
The TankVision primary display module is connected to the pressure sensor and
is the only module that needs to be calibrated.
Note:
The calibration procedure needs to be performed every time a primary
display module is installed.
Install Display Module
The full size display modules all have the same mounting dimensions. Standard
display modules are interchangeable.
Note:
It is recommended to mount the display at eye level.
1. Measure and mark mounting location for display module panel cutout and
mounting screw holes. Make sure there is clearance behind the panel for
the display and cables before cutting holes. Refer to Figure 1 for layout and
dimensions.
2. Cut out a 4 by 2 1/8-inch hole and drill four (4) holes (clearance or tapped) for
6-32 mounting screws.
3. Place display module in position and secure with four (4) screws.
4. Connect the display module cables and wires. (Refer to Wiring Section.)
Install Cab Miniature Display
1. Measure and mark mounting location for cab miniature display mounting hole.
Make sure there is clearance behind the panel before drilling hole. Refer to
Figure 2 for layout and dimensions.
2. Drill a clearance hole for 3/8" threads.
3. Place cab miniature display in position and secure with nut.
4. Connect the cab miniature display wires. (Refer to Wiring Section.)
Summary of Contents for TankVision WLA200
Page 30: ...WLA200 Rev140407 30 NOTES...
Page 31: ...WLA200 Rev140407 31 NOTES...
Page 32: ...WLA200 Rev140407 32...