ZMI
_001_
2030
0366
54-A
C
EX90
05_#
SEN_#
AQU_V
1
.f
m
- 44 -
Thermal Disinfection Cycle
• Start Thermal Disinfection
• Start delay
The solenoid valve does not open until after the pre-set start delay.
Hot water flows 10 s after start of the thermal disinfection at the earliest.
• Impact time
Hot water flows for 2 min.
After 2 min, the water flows intermittently for the rest of the pre-set time
(application phase).
• Safety window
The water in the circulation line will be cooled to the pre-set temperature during
this period.
• Cooling phase
The remaining hot water is flushed out of the tap.