FRANCO srl Manual of use and maintenance UCP-fly
13
2 - INSTALLATION
2.1 Before installing
In order to start the UCP humidifier, it is necessary to comply with the following requirements:
Connection to the electric power supply with voltage and frequency suitable for the machine and
with grounding and safety devices;
Connection to water supply (pressure required: between 2 and 4 atm);
The operating temperature must be between 1°C and 40°C.
The unit must be supplied with drinking water, or water having a low fixed residue, or treated
water. The water quality affects the unit maintenance, the frequency of the servicing operations
and the correct functioning of the humidifier.
We suggest suggested to provide the unit with temporized discharging system to drain the
water tank, as a bleed-off valve, in order to keep the unit in good working conditions.
The installation must meet the safety requirements provided by local regulation in force.
F
ollow the regulations of the UNI 8884 standard “Requirements and treatment of water cooling
and humidification system.” conductivity <100 μS/cm and total hardness <5° fH (50 ppm CaCO3).
Make sure that all the connections necessary to operate the equipment have been properly prepared.
2.2 Positioning
The UCP humidifier / cooler must be installed horizontally, hanging off the ground, with the non-
atomized water tank facing down. Use the suitable brackets to hang the machine and to hold it in
the correct operating position with an appropriate sealing system (the distance between holes is
shown in Figure 2.1).
Fig.2.1
Holes positioning for hanging
Example of installation on the ceiling with chains.
The machine must be installed in horizontal position.
The positioning of the UCP-fly must be done by maintaining the minimum recommended
distance that allows the correct operation of the machine and to perform maintenance when
needed. Choose the most suitable position for the humidification and cooling of the
environment according to the type of installation adopted.
In order to prevent fog condensation on walls, maintain a minimum distance of 1m from the
ceiling and the walls, while as for the front wall, the distance has to be calculated based on the
UCP-fly model chosen and the amount of water atomized.
The machine installation must meet the safety distance in
accordance with the DIN UI EN ISO 13857/2008 norm. The machine must
be placed at least at 2.5 meters above the ground level.
1m
OK
NO