Issue Date: 08-27-07 Rev. Date: 04-24-08 Rev. Level: 07 ECN: n/a OIPM P/N: 3420486
Page 5 of 8
Install heater so that the
quartz tubes are horizontal. Failure to do this may
cause the heating element within the tube to sag and
cause premature burnout.
HEATER INSTALLATION continued
SUSPENSION ALTERNATIVES
Your CH series heater can be mounted with either the
standard chain suspension or optional CH-MB(p/n-
04863802), adjustable mounting bracket kit.
Standard Mounting:
The heater is to be chain-hung as shown in figure 1. Cut
the 16ga. chains (two 4 foot chains are provided) to desired
length. Attach chains to heater with “S”-hooks provided
and suspend from overhead structure. Crimp “S”-hooks
closed after assembly.
Optional Bracket Mounting Kit; CH-MB(p/n-04863802):
As an option you can mount your heater with two
adjustable mounting brackets and fastening hardware.
Using the mounting centers specified in figures 2 & 3,
mount your adjustable mounting brackets (bends to the
inside). Once mounted, assemble the heater to brackets
with mounting hardware, these brackets enable the
heater to be angled in 15-degree increments up to 45
degrees. This kit includes two adjustable brackets, four
10-32 x ½” screws and four 10-32 keps nuts.
Figure 2: end view
Figure 3: side view
Figure 1: end view
ELECTRICAL SHOCK
HAZARD
•
Serious injury or death
may occur.
•
Disconnect from electrical
supply before installing or
servicing this heater.
•
Read and follow
installation clearance
requirements on page 4
Optional mounting brackets
CH-46C = 41.0
CH-57C = 52.0
OPTIONAL BRACKET MOUNTING
STANDARD MOUNTING
10-32 x ½’
Screws
Mounti
ng
Bracket
10-32 Nylon
Keps Nut
Figure 4: optional mounting view