![Fortress Technologies PURE VIEW FULL GLASS PANEL AL13 HOME Installation Instructions Manual Download Page 22](http://html.mh-extra.com/html/fortress-technologies/pure-view-full-glass-panel-al13-home/pure-view-full-glass-panel-al13-home_installation-instructions-manual_2322445022.webp)
22
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Fig. 1
Fig. 2
ATR With 3” [76mm] Proud Post /
Over The Post
3” Post
[76mm]
ATR
ATR
ATR With 2” [51mm] Proud Post /
Over The Post
2” Post
[51mm]
5/16”
[8mm]
Minimum
5/16’ [8mm]
Minimum
Step 4:
Round ATR Splice
1. To install an ATR splice: Center the splice over the post and
with force press down over the ATR. As shown in Fig. 1,2,3.
2. A Rubber Mallet might need to be used to install. If using a
Rubber Mallet, use a cloth to protect the splice from damage.
•
ATR splices reference the inside of the post and snap down
around the ATR.
•
ATR splices allow up to 1/2” [12.5mm] of length variation
from the edge of the post. As shown in Fig. 4,5,6.
Fig. 1
Fig. 2
Fig. 3
CORNER
LINE
END
Fig. 4
Fig. 5
Fig. 6
CORNER
LINE
END
1/2”
[12.5mm]
1/2”
[12.5mm]
1/2”
[12.5mm]
1/2”
[12.5mm]
1/2”
[12.5mm]