![Fortress Technologies PURE VIEW FULL GLASS PANEL AL13 HOME Installation Instructions Manual Download Page 17](http://html.mh-extra.com/html/fortress-technologies/pure-view-full-glass-panel-al13-home/pure-view-full-glass-panel-al13-home_installation-instructions-manual_2322445017.webp)
17
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
PROUD POST: ROUND ACCENT TOP RAIL (ATR)
Step 1:
Round ATR Spacers
1. Attach Spacers using provided self-drilling screws with a
5/16” [8mm] nut driver, two screws per spacer. As shown in
Fig. 2.
•
The Accent Top Rail Kit comes with 6 spacers in the 69.89”
[1775mm] kit.
•
The spacers should be equally spaced along the length
of the rail, with no more then 14” [279.5mm]
spacing
between them. As shown in Fig. 1.
•
The end spacers should be placed as close to the end
brackets as possible.
Note:
• DO NOT REMOVE BACKING OF DOUBLE SIDED TAPE UNTIL
YOU ARE READY TO PERMANENTLY ATTACH THE ATR.
Fig. 1
Double Sided
Tape
Fig. 2
14” [355.5mm]
Max
Spacer Attached
Next To Bracket