![Fortress Technologies PURE VIEW FULL GLASS PANEL AL13 HOME Installation Instructions Manual Download Page 16](http://html.mh-extra.com/html/fortress-technologies/pure-view-full-glass-panel-al13-home/pure-view-full-glass-panel-al13-home_installation-instructions-manual_2322445016.webp)
16
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Step 5:
Install Top Rail (Alternative)
1. Carefully slip Top Rail over the top of the glass into the top
Bracket Cups.
2.
Carefully slip
Ratchet Straps
over top rail and underneath
bottom rail.
3. Slowly clamp each Strap until glass is fully seated in top rail.
As shown in Fig. 1.
4. Pre-drill
Bracket Cup
holes for screws using a 3/16”
[89.5mm] drill bit.
5. Secure top rail to Bracket Cups with provided T-25 Drive
Thread-Cutting Screws. Use low speed setting on drill.
Step 6:
Attach I-Support To Deck
1. Fasten I-Support to deck surface with the supplied Phillips
Head Wood Screw.
Tip:
•
Pre-drill with a 1/16” [1.5mm] drill bit.
Fig. 1
Fig. 1
Pure View
Full Glass
Ratchet Straps