Fe
26
AXIS INSTALLATION
13
Fig. 2
Step 4:
Clean Rails & Pickets
1. Use a file to smooth cut edges. As shown in Fig. 1.
2. Remove any metal shavings and dust with a brush or rag.
3. Make sure surfaces to be painted are clean.
Fig. 1
Step 5:
Apply Spray Paint To Cut Areas
1. Using a piece of cardboard as a mask, apply the 1
st
coat of
Fortress zinc based touch-up paint.
2. Allow to dry before applying second coat.
3. Apply the 2
nd
coat of Fortress zinc based touch-up paint.
4. Allow to dry and install.
Fig. 1
2X
Clamped wood 2” x 4”
[60mm x 102mm]