FortiController-5913C Session-Aware Load Balancing Cluster (SLBC) System Guide
10-500-259409-20160210
13
FortiController-5913C
Hardware installation
Before use, the FortiController-5913C must be correctly installed into a FortiGate-5144C
chassis.
This chapter describes:
•
Installing CFP2 and SFP+ transceivers
•
FortiController-5913C mounting components
•
Inserting a FortiController-5913C board
•
Shutting down and Removing a FortiController-5913C board
•
Resetting a FortiController-5913C board
•
Installing CFP2 and SFP+ transceivers
You must install CFP2 transceivers to connect FortiController-5913C front panel F1 and
F2 interfaces to 100-gigabit networks. The CFP2 transceivers are inserted into the F1 and
F2 cage sockets on the FortiController-5913C front panel. You can install the CFP2
transceivers before or after inserting the FortiController-5913C board into a chassis.
You must install SR SFP+ transceivers for normal operation of FortiController-5913C B1
and B2 front panel interfaces. The FortiController-5913C ships with two SR SFP+
transceivers. You can also configure the B1 and B2 front panel interfaces to operate at
1-gigabit and install SFP transceivers. You can install these transceivers before or after
inserting the FortiController-5913C board into a chassis.
You can install the following types of transceivers for connectors B1 and B2:
•
SFP+ SR (10 gigabits)
•
SFP+ LR (10 gigabits)
•
SFP (1gigabit)
To install QSFP+ or SFP+ transceivers
To complete this procedure, you need:
•
A FortiController-5913C board
•
CFP2or SFP+ transceivers
•
An electrostatic discharge (ESD) preventive wrist or ankle strap with connection cord
1
Attach the ESD wrist strap to your wrist and to an available ESD socket or wrist strap
terminal.
FortiController-5913C boards must be protected from static discharge and physical
shock. Only handle or work with FortiController-5913C boards at a static-free
workstation. Always wear a grounded electrostatic discharge (ESD) preventive wrist
strap when handling FortiController-5913C boards.