13
MAINTENANCE
FIG. 14
FIG. 15
DAILY MAINTENANCE IS SPECIFIED ON PAGE 4
OF THE OPERATOR'S MANUAL, AND IS TO BE
PERFORMED BY THE OPERATOR. LISTED
BELOW ARE PERIODIC MAINTENANCE ITEMS
TO BE PERFORMED BY YOUR COMPANY'S
MAINTENANCE DEPARTMENT:
1. Lift the bellows, (See FIG. 14) if used, and wipe off
the traverse driveshaft and the bearing rails monthly.
When a squeaking noise is coming from the actuator
bearings, follow the lubrication procedure for actuator
and linear bearings. Generally, this will be every
6 months to a year.
2. Check the gib plate adjustment in the carriage base
every 3 months. See Page 21.
3. Replace the four foam rail wipers (FIG. 15) every 6
months of operation. Note: Wipers are removed if
optional bellows are installed.
4. Clean the interior and the top cover of the Coolant
Tank as necessary and at least every 6 months.
5. Check the brushes on the auto traverse drive motor
once every 24 months. Replace as necessary.
Carriage
Rails
THE UNINTERUPTABLE POWER SUPPLY (UPS)
WHICH IS USED AS A BACKUP TO HOLD THE
BEDKNIFE TO THE ELECTROMAGNETS DURING
A POWER INTERUPTION HAS A BATTERY.
THIS BATTERY HAS A THREE YEAR LIFE AND
MUST BE REPLACED AFTER THREE YEARS OF
SERVICE LIFE. SEE THE PARTS LIST FOR
REPLACEMENT BATTERY PART NUMBER.
Summary of Contents for ACCU-Pro 670
Page 34: ...34 ELECTRIC SCHEMATIC 67095233...
Page 35: ...35 This Page Left Intentionally Blank for Note Taking Purposes...
Page 36: ...36 PARTS LIST 6709528 MAIN BASE ASSEMBLY...
Page 38: ...38 PARTS LIST Continued 6709529 GRINDING HEAD ASSEMBLY...
Page 40: ...40 PARTS LIST Continued 6709520 TRAVERSE CARRIAGE ASSEMBLY...
Page 42: ...42 PARTS LIST Continued 6709524 BEDKNIFE SUPPORT ASSEMBLY...
Page 44: ...44 PARTS LIST Continued 6709523 CONTROL PANEL ASSEMBLY 50 51...
Page 46: ...46 PARTS LIST Continued 6709523 ELECTRICAL ASSEMBLY...
Page 48: ...48 PARTS LIST Continued 7469909 COOLANT PUMP TANK ASSEMBLY 15...
Page 50: ...50...