Operating Manual EMGZ 321.EIP
19.10.2017
8
3
Quick Installation Guide
In a Plug & Play configuration the set-up of the EMGZ321._.EIP and the
corresponding force sensors is straight forward and limited to only the offset
compensation and the calibration procedure.
3.1
Preparations for Set-up
1.
Read the Operation Manual of your force measuring sensors and amplifier
2.
Check your requirements such as:
– Desired output configuration 0…10V, ±10V or 0/4… 20mA
– Display unit of nominal force
3.
Draw the wiring diagram for your configuration (ref. to 3.6 “Wiring the Tension
Monitoring System“)
4.
If required, determine special parameters (ref. to 8 “Parameter Setting over the
Operation Panel”)
3.2
Installation Procedure
1.
Mount your force maesuring roller to the machine frame.
2.
Wire the force measuring sensors (ref. to 3.6 “Wiring the Tension Monitoring
System“)
3.
Connect the amplifier to the power supply.
4.
The power supply voltage must be in the range 18 to 36V DC.
5.
Perform offset compensation and calibration (ref. to paragraphs 7.3 to 7.4)
6.
If required, do additional settings (ref. to “8 “Parameter Setting over the Operation
Panel”)
7.
Integrate the amplifier in your Ethernet network respectively your PLC.