www.fmiproducts.com
125795-01B
21
INSTALLATION
Continued
6. Find the right split crossover log (D-022)
The bottom of the log has a rectangular
stand off that fits in the slots on the right
side of the front right log and the middle
split log. Place this log as shown in Fig-
ure 33.
Figure 33 - Installing Right Split
Crossover Log
Right Split Cross-
over Log (D-022)
Right Front Log
Square Peg
Figure 34 - Installing Front Top Log
Front Top Log (D-024)
Rectangular
Peg
Right Split Cross-
over Log (D-022)
Middle Split Log
7. Find the front top log (D-024). See Figure
34. The left end of this log has a square hole
that fits over a square peg that is on the top
of the middle split log. The right end of this
log rests behind the knot on the top of the
front right log.
8. Find the back top log (LMF36-SC and
VFGT24 inch models: D-062 or LMF42-SC
and VFGT30 inch models: D-023 or LMF48-
SC and VTGF36 inch models: D-029). See
Figures 35, and 35 A. The left end of this
log has a round hole that fits over the round
peg that is on the top of the back left log. The
right end of this log has a rectangular hole
that fits over the rectangular peg on the top
of the right crossover log.
Figure 35 - Installing Back Top Log and
Final Assembly
Figure 35A - Installing Back Top Log,
Top View
Right Split Cross-
over Log (D-022)
Back Top Log (D-062,
D-023 or D029)