29
General Operation
Temperature Controller
When the controller is set to a new set-point the bath heats or cools to the new
temperature. Once the new temperature is reached the bath usually takes 15 – 20
minutes for the temperature to settle and stabilize. There may be a small over shoot or
undershoot.