19. Place the cell removal/installation tool into the holes on the lid. Carefully
install the lid onto the basket, where the basket was installed previously
in the furnace.
20. Place one circular 2.54 cm (1 in) thick piece of insulation on top of bas-
ket.
21. Place the top thermal shunt disk in the furnace.
22. Place one circular 2.54 cm (1 in) thick piece of insulation on top of the
thermal shunt disk.
65
8 Fixed Point Cell Installation Instructions
Procedure
Figure 27
Width of insulation placed on top of basket assembly.