Flowserve.com 16
PUIOM000649-00-UIM (EN/AQ)
August 2022
SEM-100SS User Instructions
Place the gasket and electronic assembly onto the meter assembly.
Reinstall the 8 screws (DD6P-46A) to secure the electronic assembly to the
meter assembly. Tighten the screws to 32-36 inch-pounds in a star pattern
to avoid any leakage.
5.2 Meter Chamber Removal
Exposure to chemicals can cause bodily harm. Before
disassembling, thoroughly flush the meter with water. Always wear
appropriate gloves, eye protection and any other necessary PPE
while working with chemicals.
Ensure that the meter is not under pressure before continuing.
Remove the 8 screws (DD6P-46A) to remove electronic assembly (S10-11B
COMPLETE). Remove the 4 screws (SFM10000-19) that secure the meter
plate (SFM10000-14A) to the fluid housing (SFM10000-13A). Remove the
meter plate and O-ring (SFM10000-18). The meter chamber can now be
removed for cleaning or replacement.
5.3 Meter assembly procedure
Ensure that the bottom O-ring (SFM10000-17) is in place. Insert the
meter chamber into the fluid housing (SFM10000-13A). Place O-ring
(SFM10000-18) around the bottom of the meter plate (SFM10000-14A)
and place on top of the fluid housing (SFM10000-13A). Secure with 4 short
screws (SFM10000-19) torqued to 32-36 inch-pounds. After inspecting for
damage, install the gasket (S10-06SS) and the electronic assembly (S10-
11B COMPLETE) using the 8 long screws (DD6P-46A) torqued to 32-36
inch-pounds.