Flowserve IPS-Beacon VB-105 Installation Operation & Maintenance Download Page 5

 

 

IPS BEACON ENGLISH  26999949  03-13 

Page 5 of 16

 

flowserve.com

 

Each product has a unique serial number.  Check that 
this number corresponds with that advised and always 
quote this number in correspondence as well as when 
ordering spare parts or further accessories. 
 

2.2  Handling 

Boxes, crates, pallets or cartons may be unloaded 
using fork lift vehicles or slings dependent on their 
size and construction. 

 

2.3  Storage 

 Store the equipment in a clean, dry 

location away from vibration.  Leave protective covers 
in place to keep dirt and other foreign material out of 
casing. 
 

2.3.1  Storage and packaging 

Normal packaging is designed to protect the unit and 
parts during shipment and for dry, indoor storage. 
 
After unpacking, protection will be the responsibility of 
the user. 
 

2.4  Recycling and end of product life 

At the end of the service life of the product or its 
parts, the relevant materials and parts should be 
recycled or disposed of using an environmentally 
acceptable method and in accordance with local 
regulations.  If the product contains substances that 
are harmful to the environment, these should be 
removed and disposed of in accordance with current 
local regulations. 
 

2.5  Disposal Instructions 

 At the end of the product’s life, do not dispose of 

any electronic component or instrument in the domestic 
waste.  Disposal should be done in accordance with 
applicable regulations, which vary from state to state 
and country to country.  The IPS Beacon unit includes a 
built-in battery and should be disposed of in accordance 
with applicable battery disposal regulations.  Batteries 
should not be incinerated, unless suitable procedures 
are followed and qualified handlers have taken 
appropriate precautions.  Exposure of these cells to 
high temperatures or fire can cause the cells to vent 
and/or rupture.  These cells do not contain dangerous 
substances.  The reaction products are inorganic and 
do not represent environmental hazards, once the 
decomposition or neutralization process has terminated. 
 

Disposal in Europe 

Batteries for disposal should not be transported by air.  
For road transport of dangerous goods ADR special 
provision 636 and packing instruction 903a apply. 
 

Disposal in US 

Hazardous waste of spent batteries can be disposed 
after they are first neutralized through an approved 
secondary treatment prior to disposal.  Disposal of 
spent batteries should be performed by authorized, 
professional disposal company, which has the 
knowledge in the requirements of the Federal, the State 
and the Local authorities regarding hazardous 
materials, transportation and waste disposal.  In any 
case it is recommended to contact the local EPA office. 
 

3  DESCRIPTION 

The IPS Beacon is a cost effective means of 
measuring the basic health of equipment.  It is 
designed to quickly convey the health of any 
equipment it is attached to, based on vibration and 
temperature measurements. 
 
The IPS Beacon is a battery powered unit that offers the 
ability to measure 3-axis vibration and temperature of 
any equipment it is attached to.  The IPS Beacon is 
completely encapsulated including battery, electronics 
and sensor packaged inside a 316L SS case.  The IPS 
Beacon also provides two LED indicator lights for a 
quick visualization of equipment health. 
 

3.1  Configurations 

Base IPS Beacon unit is provided with preset factory 
set points.  Each unit also offers optional upgrades to 
allow for data logging [see section 3.5  

Take away 

memory module (TAM)

], data downloads to a PC 

format and unit configuration. 
 
The IPS Beacon offers the ability to program alarm 
levels for each of the vibration axes (see Figure 3:

  X-Y-

Z axis 

orientation) and temperature values.  If those 

alarm levels are exceeded, the IPS Beacon will provide 
a visual indication using the LED indicator lights and 
also log the last alarm value for each of the data 
parameters. 
 

3.1.1  Factory preset alarm settings 

The IPS Beacon comes pre-programmed with the 
following default settings for the user-configurable 
options: 
 
 

 

Summary of Contents for IPS-Beacon VB-105

Page 1: ...eration Maintenance Condition monitoring and alert system for vibration and temperature PCN 26999949 03 13 E Original instructions These instructions must be read prior to installing operating using a...

Page 2: ...ake away memory module TAM 7 4 MAINTENANCE 7 4 1 Tools required 7 4 2 Turning unit on off 7 4 3 Low battery 7 5 CUSTOM CONFIGURATION PROGRAMMING 7 5 1 User configurable settings 7 5 2 Connecting to IP...

Page 3: ...ty aspects relating to machinery and equipment and the satisfactory provision of technical documents and safety instructions Where applicable this document incorporates information relevant to these D...

Page 4: ...g Always coordinate repair activity with operations and health and safety personnel and follow all plant safety requirements and applicable safety and health laws and regulations 1 6 3 Safety action T...

Page 5: ...organic and do not represent environmental hazards once the decomposition or neutralization process has terminated Disposal in Europe Batteries for disposal should not be transported by air For road t...

Page 6: ...ication can be obtained from Flowserve 3 3 1 IPS Beacon nomenclature Table 3 IPS Beacon nomenclature Flowserve item code Generic designation Specifications Material 9050 VB 105 IPS Beacon compact moni...

Page 7: ...ollow the power up procedure below To power up the IPS Beacon simply install the PUM to the DB9 on the side of the unit and insert the screw into the PUM tighten screw to 0 7 Nm 6 in lb torque to keep...

Page 8: ...8 Parts List and Drawings for the Flowserve part number to obtain one For details on connection to the Dock refer to the Dock IOM PCN 26999975 5 3 Setting alarm set points The IPS Beacon unit can have...

Page 9: ...IPS BEACON ENGLISH 26999949 03 13 Page 9 of 16 flowserve com Figure 3 X Y Z axis orientation Figure 4 IPS Beacon drawing Figure 5 IPS Beacon mounting pad X Y Z...

Page 10: ...d through the IPS Beacon and threaded into the tap Attach IPS Beacon 9050 to bearing housing 3200 using Phillips head fastener M6 or in x 28 18 8SS stud An alternative is to attach the IPS Beacon to t...

Page 11: ...IPS Beacon to a threaded tap VB 105 screw Cap screw to attach PUM or TAM to IPS Beacon VB 101 Dock Programming dock to connect IPS Beacon to PC and change configuration settings DockTalk Configuration...

Page 12: ...n of the unit or improper installation looseness Unit configuration incorrect If the inaccurate missing data problem is across all sensor data parameters reload the original configuration for the IPS...

Page 13: ...his Declaration refers are in compliance with the Directives and Norms specified herein ATEX Directive 94 9 EC all amendments Basis for compliance The equipment has been assessed using the following s...

Page 14: ...emonstrate that the product meets the requirements of the Directives has been compiled by the signatory below and is available for inspection by the relevant enforcement authorities Signed ___________...

Page 15: ...IPS BEACON ENGLISH 26999949 03 13 Page 15 of 16 flowserve com Notes...

Page 16: ...da Flowserve Corporation 5215 North O Connor Blvd Suite 2300 Irving Texas 75039 5421 USA Telephone 1 972 443 6500 Fax 1 972 443 6800 Europe Middle East Africa Flowserve Worthington S r l Via Rossini 9...

Reviews: