Flowserve IPS-Beacon VB-105 Installation Operation & Maintenance Download Page 7

 

IPS BEACON ENGLISH  26999949  03-13 

Page 7 of 16

 

flowserve.com

 

3.4  Power-up module (PUM) 

The Power-up module (PUM) must be attached to the 
IPS Beacon to turn on the unit.  When disconnected 
from the IPS Beacon, the unit remains off and does 
not take any sensor readings. 

 the PUM provides on/off functionality only. 

 

3.5  Take away memory module (TAM) 

The optional take-away memory module (TAM) powers-
up the IPS Beacon unit and downloads sensor data 
from the unit.  When connected to the IPS Beacon unit 
the TAM will log the sensor data as it is recorded on 
every interval. 
 
The TAM module has enough built-in memory to 
capture approximately 28 000 sensor data readings.  
Depending on how often the IPS Beacon unit is set to 
log data, the amount of time varies for which the TAM 
can capture sensor readings.  See section 5, 

Custom 

configuration programming

, to adjust the data logging/ 

read interval for the IPS Beacon. 
 

4  MAINTENANCE 

 

Warning: Do not open unit.

 

 Warning: battery pack is not 

replaceable.  Do not attempt to replace. 

 
Power is provided by a lithium battery pack, located 
in the IPS Beacon housing.  Battery life depends 
upon measurement intervals.

 

 

4.1  Tools required 

A typical range of tools that will be required to 
maintain the IPS Beacon is listed below: 

 

PC computer with USB adapter 

 

Dock software configuration utility 

 

IPS Beacon dock module (VB-101-DOCK) 

 

Hand wrenches 

 

Phillips-head screwdriver 

 

4.2  Turning unit on/off 

The IPS Beacon is shipped in the off position and you 
will be required to remove protective tape and the 
spacer that keeps the PUM in the off position.  
Discard the tape and spacer and follow the power up 
procedure below. 
 
To power up the IPS Beacon, simply install the PUM 
to the DB9 on the side of the unit and insert the screw 
into the PUM (tighten screw to 0.7 Nm (6 in.•lb) 
torque to keep PUM tightly fastened to IPS Beacon). 

The green LED will flash 3 times in succession to 
confirm power-up.  This will activate sensor readings 
and alarm indications at the pre-configured levels

.

 

 
To power off the IPS Beacon remove the power-up 
module (PUM) from the DB9 on the side of the unit.  
This will stop any sensor readings. 

 The TAM can also be used to turn the IPS 

Beacon on or off in place of the PUM. 
 

4.3  Low battery 

 

The battery pack is NOT user replaceable.

  

Low batteries can only be remedied by replacing the 
entire IPS Beacon unit. 
 
Power is provided by a non-replaceable battery pack, 
located in the inner portion of the unit.  Battery life is 
typically 4 years, dependent on data reading interval.  
Battery voltage should normally be between 2.8 and 
3.6 VDC.  If it is lower than this, the entire IPS Beacon 
unit will need to be replaced. 
 

5  CUSTOM CONFIGURATION 
PROGRAMMING 

 This section is optional.  As long as your 

specific application was communicated to the factory 
prior to shipment, the IPS Beacon unit is pre-
configured for your specific use. 

 

Warning:

 errors in programming can 

render the IPS Beacon unit inoperable; proceed with 
caution.  Flowserve is not liable for any damage 
caused by programming errors. 
 
In order to perform any of the functions described in 
this section, you will first need to connect to the IPS 
Beacon unit using the software configuration utility as 
described below in section 5.2, 

Connecting to the IPS 

Beacon unit

 

5.1  User configurable settings 

The IPS Beacon provides certain settings that can be 
configured by the user.  These parameters are listed 
in table 5 below: 
 

 

 

 

Summary of Contents for IPS-Beacon VB-105

Page 1: ...eration Maintenance Condition monitoring and alert system for vibration and temperature PCN 26999949 03 13 E Original instructions These instructions must be read prior to installing operating using a...

Page 2: ...ake away memory module TAM 7 4 MAINTENANCE 7 4 1 Tools required 7 4 2 Turning unit on off 7 4 3 Low battery 7 5 CUSTOM CONFIGURATION PROGRAMMING 7 5 1 User configurable settings 7 5 2 Connecting to IP...

Page 3: ...ty aspects relating to machinery and equipment and the satisfactory provision of technical documents and safety instructions Where applicable this document incorporates information relevant to these D...

Page 4: ...g Always coordinate repair activity with operations and health and safety personnel and follow all plant safety requirements and applicable safety and health laws and regulations 1 6 3 Safety action T...

Page 5: ...organic and do not represent environmental hazards once the decomposition or neutralization process has terminated Disposal in Europe Batteries for disposal should not be transported by air For road t...

Page 6: ...ication can be obtained from Flowserve 3 3 1 IPS Beacon nomenclature Table 3 IPS Beacon nomenclature Flowserve item code Generic designation Specifications Material 9050 VB 105 IPS Beacon compact moni...

Page 7: ...ollow the power up procedure below To power up the IPS Beacon simply install the PUM to the DB9 on the side of the unit and insert the screw into the PUM tighten screw to 0 7 Nm 6 in lb torque to keep...

Page 8: ...8 Parts List and Drawings for the Flowserve part number to obtain one For details on connection to the Dock refer to the Dock IOM PCN 26999975 5 3 Setting alarm set points The IPS Beacon unit can have...

Page 9: ...IPS BEACON ENGLISH 26999949 03 13 Page 9 of 16 flowserve com Figure 3 X Y Z axis orientation Figure 4 IPS Beacon drawing Figure 5 IPS Beacon mounting pad X Y Z...

Page 10: ...d through the IPS Beacon and threaded into the tap Attach IPS Beacon 9050 to bearing housing 3200 using Phillips head fastener M6 or in x 28 18 8SS stud An alternative is to attach the IPS Beacon to t...

Page 11: ...IPS Beacon to a threaded tap VB 105 screw Cap screw to attach PUM or TAM to IPS Beacon VB 101 Dock Programming dock to connect IPS Beacon to PC and change configuration settings DockTalk Configuration...

Page 12: ...n of the unit or improper installation looseness Unit configuration incorrect If the inaccurate missing data problem is across all sensor data parameters reload the original configuration for the IPS...

Page 13: ...his Declaration refers are in compliance with the Directives and Norms specified herein ATEX Directive 94 9 EC all amendments Basis for compliance The equipment has been assessed using the following s...

Page 14: ...emonstrate that the product meets the requirements of the Directives has been compiled by the signatory below and is available for inspection by the relevant enforcement authorities Signed ___________...

Page 15: ...IPS BEACON ENGLISH 26999949 03 13 Page 15 of 16 flowserve com Notes...

Page 16: ...da Flowserve Corporation 5215 North O Connor Blvd Suite 2300 Irving Texas 75039 5421 USA Telephone 1 972 443 6500 Fax 1 972 443 6800 Europe Middle East Africa Flowserve Worthington S r l Via Rossini 9...

Reviews: