![Flowserve IPS-Beacon VB-105 Installation Operation & Maintenance Download Page 11](http://html1.mh-extra.com/html/flowserve/ips-beacon-vb-105/ips-beacon-vb-105_installation-operation-and-maintenance_2308478011.webp)
IPS BEACON ENGLISH 26999949 03-13
Page 11 of 16
flowserve.com
7.2 Take away memory module (TAM)
The optional take-away memory module (TAM)
powers-up the IPS Beacon unit and downloads data
from the unit. When connected to the IPS Beacon
unit the TAM will log the sensor data as it is recorded
on every interval.
To attach the TAM, simply remove the power-up
module (PUM) from the IPS Beacon (if attached) and
plug in the TAM to the DB9 port on the IPS Beacon.
Once attached, wait for 4 LED light flashes from the
IPS Beacon (the first 3 flashes will be single flashes
while the last 3 will be double-flashes) which signals
that the TAM has downloaded the current sensor
data and last alarm values from the IPS Beacon. The
TAM can now be disconnected from the IPS Beacon,
or left attached to continuously log each set of sensor
data readings.
The TAM module has enough built-in memory to
capture approximately 28 000 sensor data readings.
Depending on how often the IPS Beacon unit is set to
log data, the amount of time varies for which the TAM
can capture sensor readings. See section 5,
Custom
configuration programming
, to adjust the data logging
interval for the IPS Beacon.
8 PARTS LIST AND DRAWINGS
Figure 6: IPS Beacon LED lights
Table 7: IPS Beacon parts and accessories list
Model
Description
VB-105
IPS Beacon
VB-105 TAM
Take away memory module to log sensor data on
IPS Beacon unit
VB-105
mounting kit
Mounting pad and bolt to attach IPS Beacon to a
threaded tap
VB-105 screw Cap screw to attach PUM or TAM to IPS Beacon
VB-101 Dock
Programming dock to connect IPS Beacon to PC
and change configuration settings
DockTalk
Configuration software utility
9 CERTIFICATION
The following certifications are applicable to the IPS
Beacon:
Model: VB-105
0518
II 1 GD
Ex ia
CSA 2012 2554102
IECEx SIR.12.0074
Cl I, Division 1, Grps A, B,
C, D; T4
Cl I, Zone 0, Ex ia IIC T4
Cl I, Zone 0, AEx ia IIC T4
Tem. Code T4
-40°C ≤ Ta ≤ +85°C
Sira 12ATEX2188
Ex ia IIC T4 Ga
Ex ia IIIC T135°C DA
-40°C ≤ Ta ≤ +85°C
10 TROUBLE-SHOOTING GUIDE
In the event you encounter trouble with your unit:
10.1 No flashing LEDs
There may be no flashing LEDs on the IPS Beacon
unit for several reasons:
•
Unit not powered up
•
Unit not configured correctly
See solutions below to each of the possible causes.
Unit not powered up
1. Verify the power-up module (PUM) is fully engaged
in the DB9 port (and screw tightened to the proper
torque) of the IPS Beacon unit. (See section 4,
Maintenance
, on how to turn on the unit).
If the problem is not solved and the
optional IPS Dock and DockTalk software has
been purchased, go to Step 2.
2. Take the IPS Beacon unit to a safe area and
connect to the IPS Dock and use the DockTalk
software utility as described in section 5.2. If you
cannot connect to the IPS Beacon unit, contact
Flowserve factory for additional support. (See
section 10.2.)
3. Refer to Dock IOM (PCN 26999975) for
instructions on how to read the battery level. If it is
above 2.8 V skip to
Unit not configured correctly
section below. If the level is below 2.8 V, the IPS
Beacon unit will need to be replaced.
GREEN light
RED light