![Flowserve IPS-Beacon VB-105 Installation Operation & Maintenance Download Page 2](http://html1.mh-extra.com/html/flowserve/ips-beacon-vb-105/ips-beacon-vb-105_installation-operation-and-maintenance_2308478002.webp)
IPS BEACON ENGLISH 26999949 03-13
Page 2 of 16
flowserve.com
CONTENTS
Page
1 INTRODUCTION AND SAFETY ........................... 3
General ............................................................ 3
1.2 CE Marking and approvals .............................. 3
1.3 Disclaimer ....................................................... 3
1.4 Copyright ......................................................... 3
1.5 Duty conditions................................................ 3
1.6 Safety .............................................................. 4
1.7 Specific machine performance ........................ 4
2 TRANSPORT AND STORAGE ............................. 4
2.1 Consignment receipt and unpacking .............. 4
2.2 Handling .......................................................... 5
2.3 Storage ............................................................ 5
2.4 Recycling and end of product life .................... 5
2.5 Disposal Instructions ....................................... 5
3 DESCRIPTION ...................................................... 5
3.1 Configurations ................................................. 5
3.2 Alarm mode ..................................................... 6
3.3 Performance and operation limits ................... 6
3.4 Power-up module (PUM) ................................ 7
3.5 Take away memory module (TAM) ................. 7
4 MAINTENANCE ..................................................... 7
5 CUSTOM CONFIGURATION PROGRAMMING ... 7
5.1 User configurable settings .............................. 7
5.2 Connecting to IPS Beacon unit ....................... 8
5.3 Setting alarm set points .................................. 8
5.4 Setting time and date on IPS Beacon unit ...... 8
5.5 Reloading factory configuration ...................... 8
6 INSTALLATION ..................................................... 8
Page
7 ACTIVATE THE IPS-BEACON ............................10
8 PARTS LIST AND DRAWINGS ...........................11
9 CERTIFICATION ..................................................11
10 TROUBLE-SHOOTING GUIDE .........................11
10.1 No flashing LEDs .........................................11
10.2 Inaccurate or missing data ..........................12
11 DECLARATION OF CONFORMITY ..................13