![FlowLine LI50-1001 Instruction Manual Download Page 22](http://html1.mh-extra.com/html/flowline/li50-1001/li50-1001_instruction-manual_2308219022.webp)
LI5X Process & Temperature Meter Instruction Manual
22
SETUP AND PROGRAMMING
•
There is
no need to recalibrate
the meter
when first received from the factory.
•
The meter is
factory calibrated
prior to
shipment, for all input types, in milliamps,
volts, and degrees respectively. The calibra-
tion equipment is certified to NIST standards.
Overview
There are no jumpers involved in the setup process of the meter. The
RTD/TC selector switch, located between the SIGNAL and SERIAL
connectors, must be set accordingly for the meter to accept RTD or
thermocouple inputs, Figure 2.
Setup and programming is done through the front panel buttons.
After power and signal connections have been completed and verified,
apply power to the meter.
For
Quick User Interface Reference Guide
go to the back-inside cover
Spec Tech Industrial Electric
www.spectechind.com
888-773-2832
Spec Tech Industrial Electric
www.spectechind.com
888-773-2832