background image

SHEET 7 OF 24

 

 

ATTACH THE PANEL(S) TO THE UPPER MOUNT WITH 1/4” X 1/2” BOLTS AND 1/4” LOCK WASHERS (4 
FOR 12V SYSTEMS, 8 FOR 24V SYSTEMS) (FIGURE 1.4). TORQUE BOLTS TO 10 FT-LB MAXIUMUM. 
NOTE ORIENTATION OF CONNECTION POINTS AND CONTROLLER ON SOLAR PANELS. GROMMET 
IN MOUNT MUST BE ON SAME SIDE. (FIGURE 1.5). 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

FIGURE 1.4 

FIGURE 1.5 

Summary of Contents for 511-01354-01

Page 1: ...TAPE MEASURE INSTRUCTION P N 611 01354 01 RELEASED 6 7 22 Manufactured by Floe International Inc 48473 State Hwy 65 McGregor MN 55760 www floeintl com LIFT NOT INCLUDED NOTE MOUNTING BRACKETS ARE SOL...

Page 2: ...SHER 3 8 SAE SS 18 8 5 001 71021 00 2 FLAT WASHER 1 2 18 8 SS 6 001 71063 00 8 LOCK WASHER 1 4 S W SS 18 8 7 001 76072 00 2 NUT NYLOCK 1 2 13 ALUM 8 001 85000 00 8 TRACK NUT ZAMP SOLAR PANEL 1 4 20 IN...

Page 3: ...SS 18 8 5 001 71021 00 2 FLAT WASHER 1 2 18 8 SS 6 001 71063 00 8 LOCK WASHER 1 4 S W SS 18 8 7 001 76072 00 2 NUT NYLOCK 1 2 13 ALUM 8 001 85000 00 4 TRACK NUT ZAMP SOLAR PANEL 1 4 20 INCLUDED WITH...

Page 4: ...LS THERE ARE NUTS SUPPLIED WITH THE SOLAR PANELS 4 PER PANEL THESE WILL BE PLACED INTO THE TRACK ON THE LONG SIDE OF THE SOLAR PANEL FIGURE 1 1 TO INSTALL THE NUTS PLACE THEM AS SHOWN FIGURE 1 2 FIGUR...

Page 5: ...EET 5 OF 24 PRESS THENUTS INTO THE TRACK FIGURE 1 3 PRESS THEM AGAIN SO THAT THE THREADED HOLE FACES UP FIGURE 1 4 FIGURE 1 3 FIGURE 1 4 PRESS NUTS INTO TRACK PRESS NUTS AGAIN SO THREADED HOLE FACES U...

Page 6: ...ATTERY TYPE THE UNIT PROVIDES FOR 4 BATTERY TYPES GEL AGM WET CONVENTIONAL LEAD ACID AND LiFePO4 THERE IS A DIP SWITCH AT THE BACK OF THE SOLAR CHARGE CONTROLLER USED FOR PRESETTING YOUR BATTERY TYPE...

Page 7: ...1 4 X 1 2 BOLTS AND 1 4 LOCK WASHERS 4 FOR 12V SYSTEMS 8 FOR 24V SYSTEMS FIGURE 1 4 TORQUE BOLTS TO 10 FT LB MAXIUMUM NOTE ORIENTATION OF CONNECTION POINTS AND CONTROLLER ON SOLAR PANELS GROMMET IN MO...

Page 8: ...EMS CONNECT THE Y CABLE SUPPLIED WITH THE PANELS INTO THE SOLAR PANEL WITH THE CONTROLLER FIGURE 2 1 FIGURE 2 1 SOLAR PANEL CONTROLLER CONNECT CABLE TO PLUG ON LEFT SIDE OF CONTROLLER Y CABLE FIGURE 2...

Page 9: ...D OF THE Y CABLE CONNECT THE OTHER END OF THE Y CABLE TO THE FIRST SOLAR PANEL WIRE WITH AN INLINE FUSE ON RIGHT WITH CONTROLLER FIGURE 2 2 SOLAR PANEL CONTROLLER CONNECT ONE END OF Y CABLE TO SECOND...

Page 10: ...SHEET 10 OF 24 STEP 2 24V SYSTEMS AT THIS TIME THE CONNECTIONS SHOULD APPEAR AS SHOWN FIGURE 2 3 FIGURE 2 3 ONLY REMAINING CONNECTION TO BE MADE IS FROM THE CONTROLLER TO THE HARNESS...

Page 11: ...CONTROLLER FOR 24V SYSTEMS INTO THE GROMMET PLUG ON THE SOLAR PANEL MOUNT FIGURE 2 4 CONNECT THE REMAINING WIRE RIGHT SIDE OF CONTROLLER INTO THE HARNESS LONG WIRE WITH RING TERMINALS FIGURE 2 4 2 5 F...

Page 12: ...P 2 12V SYSTEMS CONNECT THE PLUG ATTACHED TO THE SOLAR PANEL CONTROLLER TO THE WIRE WITH THE INLINE FUSE FIGURE 2 6 FIGURE 2 6 CONNECT THE PLUG ON LEFT SIDE OF CONTROLLER TO WIRE WITH INLINE FUSE SOLA...

Page 13: ...AINING WIRE FROM THE SOLAR PANEL INTO THE GROMMET PLUG ON THE SOLAR PANEL MOUNT FIGURE 2 7 CONNECT THE SECOND WIRE S PLUG INTO THE HARNESS LONG WIRE WITH RING TERMINALS FIGURE 2 7 2 8 FIGURE 2 8 CONNE...

Page 14: ...STEP 3 SLIDE MOUNT WITH SOLAR PANEL S ONTO MAST AND ALIGN HOLES FIGURE 3 1 ATTACH MOUNT TO MAST USING 2 3 8 X 1 BOLTS AND 2 3 8 WASHERS FIGURE 3 2 TORQUE BOLTS TO 10 FT LB FIGURE 3 3 FIGURE 3 1 FIGURE...

Page 15: ...OF 24 STEP 4 NOTE THE BRACKET MAY BE ON THE BALL SCREW SIDE OR V BRACE SIDE OF THE LIFT HOWEVER THE BRACKET MUST BE ON THE TILTING CORNER POST IN MAXIS APPLICATIONS CORNER POST WITHOUT ACTUATORS ATTAC...

Page 16: ...STEP 4 INSERT 2 1 2 X 1 1 4 BOLTS WITH 2 1 2 WASHERS INTO THE LOWER MAST MOUNT SOLD SEPARATELY SEE SHEET 1 FOR BRACKET KITS FIGURE 4 1 SLIDE MOUNT ONTO CANOPY SUPPORT IN CORNER POST FIGURE 4 2 FIGURE...

Page 17: ...TACH MOUNT TO SUPPORT USING 2 1 2 NYLOCK NUTS FIGURE 4 3 TORQUE TO 60 FT LB FOR MAXIS APPLICATIONS THERE SHOULD BE A MINIMUM DISTANCE OF 3 FROM THE TOP OF THE SUPPORT TO THE TOP OF THE MOUNT FIGURE 4...

Page 18: ...SHEET 18 OF 24 STEP 5 ATTACH THE MAST TO THE MOUNT USING 2 3 8 X 1 BOLTS AND 2 3 8 WASHERS FIGURE 5 1 TORQUE TO 10 FT LB FIGURE 5 2 FIGURE 5 1 FIGURE 5 2...

Page 19: ...SHEET 19 OF 24 STEP 6 FOLLOW THE DIAGRAMS BELOW FOR WIRE ROUTING IMPORTANT KEEP WIRING AWAY FROM MOVING PARTS OR PINCH POINTS...

Page 20: ...CONNECT THE RED LEAD TO THE POSITIVE TERMINAL OF THE BATTERY AND THE BLACK LEAD TO THE NEGATIVE TERMINAL OF THE BATTERY IMPORTANT KEEP WIRING AWAY FROM MOVING PARTS OR PINCH POINTS BLACK LEAD TO NEGAT...

Page 21: ...BATTERY AND THE BLACK LEAD TO THE NEGATIVE TERMINAL OF THE SECOND BATTERY IMPORTANT KEEP WIRING AWAY FROM MOVING PARTS OR PINCH POINTS RED LEAD TO POSITIVE POST FIRST BATTERY BLACK LEAD TO NEGATIVE P...

Page 22: ...THE INTERNAL CELLS TO EQUAL STATES AND FULLY COMPLEMENT THE LOSS OF CAPACITY GEL AND AGM BATTERIES DO NOT RUN EQUALIZATION CHARGE FLOAT CHARGE BATTERY IS FULLY CHARGED AND MAINTAINED AT A SAFE LEVEL...

Page 23: ...UNIT PROVIDES FOR 4 BATTERY TYPES GEL AGM WET CONVENTIONAL LEAD ACID AND LiFePO4 THERE IS A DIP SWITCH AT THE BACK OF THE SOLAR CHARGE CONTROLLER THIS DIP SWITCH IS USED FOR PRESETTING YOUR BATTERY T...

Page 24: ...SHEET 24 OF 24...

Reviews: