GARANT drag hose spreader
Use and operation
Fliegl Agrartechnik GmbH, 84453 Mühldorf am Inn, Germany
47 of 77
7.2.3 Conducting a trial run
After the machine is set up and prepared and before work begins, a trial run must be conducted in
unloaded condition
.
Objective
Check to ensure the machine is set up and functioning properly.
Prerequisites
-
Machine is ready for operation
-
Machine is completely set up
Familiarise yourself with the basic safety instructions (see section
) and the
instructions for first-time start-up (see section 5.1) before the trial run and take
all the safety precautions listed in these sections.
Procedure
-
Turn on the machine as specified.
-
Perform all functions of the machine individually.
-
Correct the settings if necessary.
7.3 Controlling the drag hose spreader
The drag hose spreader is controlled using two double-action tractor control units.
Control unit I (spreader folding function)
Control unit II (oil motor / screw distributor function)
Fig. 34
:
Control unit in towing vehicle