INSTALLATION INSTRUCTIONS
HOSEDOWN SERIES
IMPORTANT:
READ ALL INSTRUCTIONS THOUROUGHLY AND CAREFULLY PRIOR TO INSTALLATION OF
ESSENTIALS SERIES FIXTURES AND RETAIN FOR FUTURE REFERENCE.
FLEXLIGHTINGSOLUTIONS.COM
913.851.3000
REV 082318
SURFACE MOUNT (MLT)
–
2N AND 4N MODELS ONLY
PREPARING TO INSTALL
1.
REFER TO GENERAL INSTRUCTIONS AT THE BEGINNING OF THIS SECTION.
2.
MEASURE SPACING BETWEEN BRACKETS
–
TRANSFER MEASUREMENT FROM FIXTURE TO MOUNTING SURFACE, FIG. 3.
BRACKETS SHOULD BE SPACED AT LEAST 18” O.C. FOR 2N MODEL, 36"O.C FOR 4N MODEL.
3.
REMOVE MOUNTING BRACKETS FROM FIXTURE HOUSING. REMOVE BAIL HOOK OR LAY BAIL HOOK TO ONE SIDE, FIG. 4.
4.
ATTACH BRACKET TO MOUNTING SURFACE.
5.
RAISE FIXTURE TO MOUNTING BRACKETS AND SECURE IN PLACE, FIG. 5.
6.
MAKE FINAL WIRING CONNECTIONS (REFER TO WIRING INSTRUCTIONS AT END OF THIS SECTION), FIG. 6.
FIG. 5
FIG. 4
FIG. 3
FIG. 6